5 | Locking device to Vip Shower doors | | | Houseware | Crew | Hight | |
4 | Victron and Batteries check and setup | | | | | Hight | |
5 | Transom Light | | | Electrics | | Hight | |
8 | Stern Nav Light Broken | | | | | Hight | |
4 | Clan/Change AC intake Filters | | | | | Medium | |
5 | Onboard AIR compressor broken | | Change | | | Hight | |
3 | Buy Portable Vhf | | | | | Medium | |
8 | Repair and review Anchor remotes systems | | | | | Hight | |
2 | Prepare a JOBLIST pre inspection | | | Marco | | Hight | |
5 | Send JONBUOY to service | | | Marco | | Hight | |
5 | AC water in Owner Cabin | | Inspect provenience of AC water | AC Air con | | Hight | |
5 | Fix Shower dreinage in Twin Cabin | | Changed the pump valves. | Plumbing | Vladimir | Hight | Completed |
5 | Shower wall locker are wet | | Check the watertight gasghet | | | Medium | |
8 | Download Old Jib , Code 0 , Two Code A2 - one Main | | Old Jib, Code0, and big Spy for Sailmaker | | Crew | Hight | Completed |
5 | Port Lazarette Hatcess piston to be fixed | | Changed the piston position | | Vladimiro | Medium | Completed |
5 | Hinge repair in backseat port dinette | | | Carpenter | Vladimiro | Medium | |
4 | Clean Black and grey water tank | | | | | Medium | |
4 | Boom Paint | | | Painting | Shipyard | Medium | |
5 | Improve the sink flush | | Open the box cover under the sink, then open or close the manifolds | Crew | Vladimiro | Medium | Completed |
5 | Bimini zip to be resewed | | | Upholsterer | | Medium | |
5 | STB Stancions | | Must be reallined | Blacksmith | Shipyard | Medium | |
6 | Buy ICEMAKER | | | Fornitures | | Low | |
6 | Install Icemaker | | | | | Low | |
14 | Modify galley counters | | Back of owen the two counter should be modified | Carpenter | Shipyard | low | |
5 | Blower Piping to be replaced | | | Blacksmith | Shipyard | Hight | |
3 | Radio recharge station | | List of Device to be carried , Designa a prototipe. | Carpenter | | Medium | |
8 | Wall plugs with USB incorporated | | | Fornitures | | Medium | |
1 | Radar Repair | | The problem seems to be on the scanner on the mast | B&G | Shipyard | Medium | |
1 | Iridium test | | | | | Medium | |
1 | Cameras | | | | | Medium | |
1 | Oscar Tv | | | | | Medium | |
1 | WiFI Optimization | | | | | Medium | |
8 | Finish Accounting Lug and Aug | Administration | | | | Hight | Started |
2 | Preliminary Job list | Administration | | | | Hight | Started |
8 | Improve an Inventory | Administration | During stokage in container | | | Hight | |
4 | AC winter service | Air Condition | | | | Hight | |
5 | WC Cover Broken in VIP Cabin | Bathroom | | | | Medium | |
8 | Buy an HP cleaner | Buylist | | | Crew | Hight | Completed |
8 | Buy a Fein Tool | Buylist | | | | Medium | |
5 | AUDIO TV brooken | Domotic | | | | | |
5 | Desk Crew chart table broken | General | | Carpenter | Vladimiro | Hight | Completed |
7 | Hull paint touch-ups | General | | | Shipyard | Medium | |
4 | Generator 1 - Service | Generator1 | | | Shipyard | Hight | |
4 | Generator2 - Service | Generator2 | | | Shipyard | Hight | |
14 | Sink Grinder | generic | | | | Medium | |
7 | General polishing and some retouch | Hull | | | Shipyard | Medium | |
5 | Stbd hull glasswindow is broken | Hull | | | Shipyard | Medium | |
13 | Call Port Grimaud for berth | Logistic | Called in August and September our position is stilpending | Office | Marco | Hight | OPEN |
8 | Organize the container | Logistic | | | | Hight | Started |
13 | Discharge all removable things | Logistic | Remove all removable things to take waterline buoyancy data for IOR certificates | Deckhands | Crew | Hight | Started |
13 | Clean the Hull | Maintenance | | | | | |
4 | Chain Repaint | Maintenance | | | | Medium | |
4 | Clean Galley Sink Tank | Maintenance | Done by Vladimiro, open and empty the tank | Crew | Vladimiro | Hight | Completed |
2 | Make a list of Passthrought on hull | Passthrought | | | Marco | Hight | |
2 | Inspect all passthrought and make a report | Passthrought | | | Shipyard | Hight | |
2 | Change needed Passthrought | Passthrought | | | Shipyard | Hight | |
2 | Update information and report | Passthrought | | | | Hight | |
2 | Galvanic Insulation | Passthrought | Wire all to a zink point | | Shipyard | Hight | |
8 | Bilge pump | Repair | The Sail locker bilge pump is not working | Plumbing | Crew | Hight | Noted |
15 | LED Drives | Repair | The driver is taken from a top light | Forniture | Crew | Hight | |
15 | LED bimini light | Repair | 2 of the leds are broken | Forniture | Crew | Hight | |
15 | Bimini fabric | Repair | When raining , water is leaking down | | | Hight | |
8 | The Fabric is not watertight | Repair | Find a product if applicable or change with a new one | | | | |
15 | The port aft bimini basement is leaking in Marster bathroom. | Repair | The basment is not sealed. | | Crew | Hight | |
4 | Bolt and screw anchor harm | Repair | Find and put missing bolts | Shipchandler | | Hight | |
8 | Crew Cabin Drawers | Repair | | Carpenter | Vladimiro | Low | Completed |
4 | Anchor Harm Oil Leack | Repair | Find the leack and tight the pipe connection | PowerOil | Crew | Hight | |
8 | Install springs on mooring line | Routine | | Decky | Crew | Hight | Completed |
4 | Install the softener outside the boat | Routine | | | Vladimiri | Hight | Completed |
4 | Clean Seawater intake filters, | Seawater intake | Main, Watermakers,Generators, Acondition | | Vladimiro | Hight | |
4 | Organize with shipyard the repair | Service | OilLeak MainEngine | | Shipyard | Hight | Started |
4 | Service the Main Engine | Service | | | Shipyard | Hight | |
1 | Suspend the antenna for 6 month - if Possible - | Starlink | | | | Hight | |
1 | Starlink | StarLink | | | | Medium | |
1 | Finish starlink Intallation NET cable to Peepwawe | StarLink | | | | Medium | |
13 | Dismount antenna for Regatta and cut the cable | Starlink antenna | Must be rewired | | | Hight | |
7 | Portholes | STB Storage | find and replace the rubbers | | | medium | |
14 | Galley Bottom Bilge | Storages | | Carpenter | | Medium | |
5 | Contact Williams La spezia for tender | Tender | | | Marco | Hight | Completed |
7 | Mark Beside the square | Transom | | | Shipyard | Medium | |
8 | Find water entrance from deck to the bilge | WaterLeaks_Deck | | | | Medium | |
8 | Ceiling Dismount | WaterLeaks_Deck | To have a better piccure and deep clean | | | Medium | |
4 | Watermaker 1 - Service | Watermaker Big | | | | Hight | |
4 | Watermaker 2- Service | Watermaker small | | | | Hight | |
5 | Porthole sealing gaset to be replaced | Watertight | | | | Medium | |